Custom Home Timeline in Los Angeles: From Demolition to Move-In

HANNAH A · October 23 2025

Building a custom home in Los Angeles is an exciting journey — one that blends creativity, craftsmanship, and careful coordination. As a design-build firm, ENE Builders streamlines the process by managing both the design and construction under one roof, ensuring efficiency, accuracy, and a cohesive vision from start to finish.

Whether you’re starting from a teardown or an empty lot, here’s a detailed look at what to expect — from demolition to move-in.

Pre-Construction & Design Development (2–6 Months)

Screenshot

Before any demolition begins, the design-build process starts with architecture, engineering, and city planning.

Key Steps:

  • Conceptual design and 3D renderings to visualize your home.

  • Engineering plans: structural, civil, MEP, and grading.

  • Soil report, topographic survey, and energy calculations.

  • Submittal to LADBS or local city for plan check and permits.

  • City corrections and revisions managed by the ENE Builders team.

Why design-build saves time:
Our integrated approach allows design adjustments to happen in real-time with the construction team, avoiding costly redesigns or permit delays.

Demolition & Site Preparation (2–4 Weeks)

bdcddca27c4ac3ada791b904a48b2d03

Once plans are approved and permits are issued, the demolition phase begins.

Key Steps:

  • Disconnect and cap utilities (gas, water, and electrical).

  • Demolish existing structure safely and remove debris.

  • Grade and level the site according to civil engineering plans.

  • Install temporary fencing, erosion control, and on-site facilities.

Design-Build Advantage:
Our team prepares the site with future construction in mind — every step aligns with the approved structural layout and foundation plan.

Foundation, Framing & Structure (2–3 Months)

4a76ad76c93440638dd596bf0f7bd7b0

With the site ready, construction begins from the ground up.

Key Steps:

  • Foundation trenching and steel reinforcement.

  • Pour concrete slab or raised foundation.

  • Frame walls, floors, and roof structure.

  • Install windows, doors, and sheathing.

Inspection Milestones:

  • Foundation

  • Framing

  • Roof nailing

  • Rough plumbing and electrical

ENE Tip: Keeping framing precise ensures a seamless transition into custom finishes like millwork and cabinetry later in the process.

Rough-Ins & Exterior Enclosure (2–3 Months)

e1bd6242342a721aedb80d5ea03b7691

This is where your home becomes weather-tight and begins to take shape.

Key Steps:

  • Install HVAC, electrical, and plumbing systems.

  • City inspections for MEP rough-ins.

  • Apply insulation, drywall, and exterior finishes.

  • Roofing, stucco, or siding installation.

Design Integration:
Material choices — from stucco color to window trim — are coordinated directly with our design team, ensuring the exterior aesthetic aligns with your interior palette.

Interior Finishes & Custom Details (3–4 Months)

dd86cf524fa21f036b07e59f535b367a

This is where the design vision truly comes to life.

Key Steps:

  • Interior paint and limewash finishes.

  • Custom cabinetry, built-ins, and millwork.

  • Tile, flooring, and countertops.

  • Fixture installation — plumbing, lighting, and hardware.

  • Smart home technology integration (optional).

ENE Tip: Our in-house design team sources materials early to prevent lead-time delays — especially for Los Angeles custom homes with imported or high-end finishes.

Landscaping, Hardscape & Outdoor Living (1–2 Months)

1b4d00275b028f4573a606b959d91427

Los Angeles living means maximizing indoor-outdoor flow.

Key Steps:

  • Driveway, patios, and hardscape installation.

  • Landscaping, irrigation, and fencing.

  • Pool and outdoor kitchen construction (if applicable).

  • Exterior lighting and gate systems.

Design-Build Touch:
Every outdoor detail — from tile around the pool to lighting placement — is curated to complement the home’s overall style, whether it’s Spanish Revival, Organic Modern, or European Coastal.

Final Inspections, Walkthrough & Move-In (2–4 Weeks)

iii

The final phase focuses on precision, quality, and completion.

Key Steps:

  • Final inspections for plumbing, electrical, mechanical, and building.

  • Client walkthrough and punch list completion.

  • Professional cleaning and staging.

  • Certificate of Occupancy (CO) issued.

  • Move-in and project handoff.

ENE Builders Warranty:
Every custom home includes a 1-year workmanship warranty and 3-year extended coverage for added peace of mind.

Estimated Total Duration: 12–18 Months

d66de9c5c58d766dcdfa79343771a260

A custom design-build home in Los Angeles typically takes 12–18 months from demolition to move-in, depending on the project’s scale, design complexity, and city approval timelines.

At ENE Builders, our streamlined design-build process keeps every phase coordinated — from architectural design to final inspection — ensuring your dream home comes together seamlessly.

Contact us today for a consultation and let us show you how we can transform your vision into a space you will love.

ENE BUILDERS | LA + OC Remodeling

Family owned affordable design+build firm

Specializing in Spanish revival , Modern Mediterranean Organic Design

From A-Z: Architecture | Design | General Contractor | Showroom Details obsessed + Planning perfection